Full Coupling Tests GIESEPP-1L/2L with RIT-10
General, TechnologyAfter last year´s first achievement GIESEPP has geared up once again: A fully coupled Electric Propulsion System consisting of the RIT-10 Thruster Unit, the T5-Neutralizer, Flow Control Equipment and a down-sized PPU was brought to life.
Coupling Test GIESEPP 1L/2L for LEO on Preliminary Setup
General, TechnologyDespite all COVID impacts and against all odds the GIESEPP team has progressed one step forward: Coupling ArianeGroup´s RIT-10 thruster with QinetiQ´s T5-Neutralizer and AST GmbH´s flow control equipment (FCU, EPR, RADICAL) has demonstrated the perfect cooperation of all related devices for the very first time.